Description
***SPECIAL NOTE*** This baffle is not an STC’d/PMA’d part. This part is not produced until all paperwork is completed and has a minimum 2 week lead time. It is produced under the owner produced part provision of FAA Advisory Circular AC 20-62E 4 b. (1) and 4 n. Owner/Operator Produced Part. Parts that were produced by an owner/operator for installation on their own aircraft (i.e., by a certificated air carrier). An owner/operator is considered a producer of a part, if the owner participated in controlling the design, manufacture, or quality of the part. Participating in the design of the part can include supervising the manufacture of the part or providing the manufacturer with the following: the design data, the materials with which to make the part, the fabrication processes, assembly methods, or the quality control (QC) procedures.